Address: Industry Two Road, Chaobaihe Industrial Zone, Dachang, Langfang City, China
Tel:+86-10-80842631
Fax:+86-316-8933298
E-mail:sales@kessolidscontrol.com
Address: No 3 Fengcheng, Fengcheng Three Road, Xi’an, China
Tel:+86-29-87579681
Fax:+86-29-86613026
E-mail:sales@kessolidscontrol.com
HDD is widely used for crossing roads, railways,rivers, lakes, buildings, etc. Laying long distance oil&gas pipeline and communication cables. To ensure an safety and high efficiency HDD project,Drilling fluid is necessary. KES provide an professional slurry separation plant for HDD. The handling capacity range from 150GPM~1000GPM depends on clients requirement. Also KES can design slurry separation plant for client if with special requirement.
Pipe jacking is another no-dig drilling method like shield. It’s used to cross road, railway, river and buildings. Widely used in city civil constructions. Slurry separation system play an important role in mud balance pipe jacking constructions. KES slurry separation unit can providea good performance in pipe jacking constructions. The handling capacity for theunit range from 50m³~500m³.
Shield tunneling is used to build highway, railway, subway and other transportation routes. KES can design and manufacture adaptive slurry separation system for shield constructions.