Address: Industry Two Road, Chaobaihe Industrial Zone, Dachang, Langfang City, China
Tel:+86-10-80842631
Fax:+86-316-8933298
E-mail:sales@kessolidscontrol.com
Address: No 3 Fengcheng, Fengcheng Three Road, Xi’an, China
Tel:+86-29-87579681
Fax:+86-29-86613026
E-mail:sales@kessolidscontrol.com
In oil and gas well,coal bed gas well,Geothermal well drilling project, mud plays a important role during drilling. Drilling mud influence the drilling process and whether a well can be drill successful directly. KES provides professional four stage solids control system, strong G force Shale shaker, desander, desilter, decanter centrifuge, and related solids control accessories. All of these solids control system supply a high quality drilling mud for drill. KES can help client design proper solids control system according client’s requirements.
Drilling waste management system, also called as drill cutting treatment system or drilling cutting management system. According to different applications, it can be classified as WBM drilling waste management system and OBM drilling waste management system. The main system equipments are drying shaker, cutting dryer, decanter centrifuge, screw conveyor, screw pump and tanks. The drilling waste management system can effectively control the moisture content(6%-15%). And oil content(2%-8%)in drilling cuttings and stabilizes the liquid phase performance.
HDD is widely used for crossing roads, railways,rivers, lakes, buildings, etc. Laying long distance oil&gas pipeline and communication cables. To ensure an safety and high efficiency HDD project,Drilling fluid is necessary. KES provide an professional slurry separation plant for HDD. The handling capacity range from 150GPM~1000GPM depends on clients requirement. Also KES can design slurry separation plant for client if with special requirement.
Pipe jacking is another no-dig drilling method like shield. It’s used to cross road, railway, river and buildings. Widely used in city civil constructions. Slurry separation system play an important role in mud balance pipe jacking constructions. KES slurry separation unit can providea good performance in pipe jacking constructions. The handling capacity for theunit range from 50m³~500m³.
Shield tunneling is used to build highway, railway, subway and other transportation routes. KES can design and manufacture adaptive slurry separation system for shield constructions.
River dredging, sand washing. KES slurry separation plant can be used for river dredging and sand washing. The slurry separation plant will greatly increase the project efficiency.